Eisenhower Matrix

growing Last tended 2025-07
Open full-size illustration →

The Eisenhower Matrix sorts tasks into four quadrants on two axes, urgent or not urgent, and important or not important.

The idea

The matrix takes its name from a line often attributed to U.S. President Dwight D. Eisenhower. “What is important is seldom urgent, and what is urgent is seldom important.” Historians note the attribution is disputed. The four quadrants are Important and Urgent (do now), Important and Not Urgent (schedule), Not Important and Urgent (delegate), and Not Important and Not Urgent (drop). Most people default to reacting to whatever feels urgent. That crowds out important work that is not urgent, such as planning, learning, and relationships. That work compounds over time.

When to use it

How to apply it

  1. List current tasks and commitments.
  2. Place each into one of the four quadrants.
  3. Do quadrant-1 items now, schedule time for quadrant-2 items, delegate quadrant-3 items, and eliminate quadrant-4 items.
  4. Periodically re-sort, since urgency changes but importance usually doesn’t.

Watch out for

Urgency is often self-inflicted through poor planning or other people’s poor planning; the matrix works best combined with actually protecting time for quadrant 2. It is also a coarse tool. For complex projects it is a starting filter, not a full planning method.

Sources

Commonly attributed to Dwight D. Eisenhower; popularized as a time-management tool by Stephen Covey in The 7 Habits of Highly Effective People.